The Reading Planning Commission gave preliminary/final approval Tuesday night for the Reading School District to construct a 2,100-square-foot aquaponics building at Red Knight Accelerated Academy on the Thomas Ford Campus.
The aquaponics building will utilize fish tanks to provide nutrients and water to grow plants hydroponically so that no soil is used.
The building would be built on existing paved area so it will not change the impervious coverage at the school.
Read more at WFMZ